Manufacturing of Fresh Water Cooler Flanges for m/v Agios Dimitrios
Both inlet connection water flanges and gasket of Main F.W.coolers (L.T.coolers) from sea side are found in poor condition that shown as below;
The vessel required special flanges for renew on both L.T.coolers. As per provided sketch for above flanges (mounted on Central F.W. coolers) 3 pcs flanges are produced in our workshop and after completion stored in warehouse to send any convenient port the shipowner will instruct.
Comments