ALTERNATOR REWINDING 1000KVA
At Istanbul anchorage. Disassembly, marking and removing the alternator tips and positions on the ship. Moving inside the ship and bring...
Â


Air Circuit Breaker (ACB) replacement
NW20H3PML2EWHH SCHNEIDER DRAWER MASTERPACK SWITCH DATA NOMİNAL CURRENT (IR): 2000 A – 40 ºC CUTTİNG CAPACİTY: 65 kA BREAKER NAME :...
Â


Fuel Pump Maintenance and Repair
Here is the list of items which has been changed during service; No Name Quantity Unit 1 PUMP ELEMENT (BOSCH) 8 PCS 2 PUMP VALVE (BOSCH)...
Â


ICCP AFT&FWD AND MGPS SYSTEMS RENEWALS AND GENERAL CHECKS&REPAIR OPERATION
System: ICCP AFT&FWD AND MGPS SYSTEMS Manufacturer: CATHELCO LTD Work Undertaken: ICCP AFT&FWD AND MGPS SYSTEMS RENEWALS AND GENERAL...
Â


Stern Tube Seals Service & Bonding
STERN Rope guards cut/removed. Scaffolding installed. After bonding team completed their job, the old rope guard re-welded and the...
Â


Anchor D-shackle pin Repair
BOW D-shackle repaired;
Â


562,5kW Alternator Repair / Rewinding
SPEED  900 minˉ¹ r.p.m A/V       738 A -  440 V BEARING            6328 C3 / 6328 C3 COSØ   0,8 INS        500 ϺΩ WORKS DONE:...
Â


Repair and Overhaul of 200/135m3/hr capacity PVHB125-50 BV 1505018 Fire and General service pump
Dismantling the pump in the workshop After dismantling the pump, we noticed the pump case was corroded. Furthermore, pump shaft, bearing,...
Â


Repair and Overhaul of 435m3/hr capacity Shinko SVA250S Ballast pump.
Dismantling the pump in the workshop After dismantling the pump we noticed pump case corroded pump shaft, bearing bush ,...
Â


Special Production of Hydraulic Jack
Special Production of Hydraulic Jack (as per sample landed from vessel)
Â


Manufacturing Windlass Main Bearing
Mooring Winch PORT/STBD Windlass Special Production of Main Bearing marine bronze
Â


WIRE SHEAVE PRODUCTION
Damaged sample sheaves collected from the vessel