top of page

Case Study
Home / Case Study
Search


m/v KUMPULA - Tank Cleaning
We have successfully cleaned 5 tanks and removed sludge in 2 days during cargo operation at Iskenderun Yazici Port. Job Description 1)...
Â


YOKOHAMA Pneumatic Fender Supplied
GENUINE 'YOKOHAMA' RUBBER PNEUMATIC FENDER SIZE 2.0m DIAM. x 3.5mL, P50 COMPLETE WITH HIGH STRENGTH CHAIN PROTECTION NET MADE OF: - HOT...
Â
Magnetic Compass Repair and Service
SERVICE REPORT Vessel Name: KHADEEJAH JAHAN Port of Place: Yalova Sefine Shipyard IMO no: 9159438 Ship Owner: Brave Royal Ship...
Â


Rubber Compensator manufactured
Sample Collected from Vessel: New Rubber Compensator (Rubber expansion joints) manufactured: Flanges: carbon steel Rubber material: NBR...
Â


m/t Paros Wind Repaired Successfully
PAROS WIND and CS JADEN collided at the North of Bosporus, Black Sea.
Â


Condenser Tube Repair
SERVICE REPORT Vessel Name: KHADEEJAH JAHAN Port of Place: Yalova Sefine Shipyard IMO no: 9159438 Ship Owner: Brave Royal Ship...
Â


DN550 Expansion Joint - Compensator
flange: St. 37.2 carbon steel joint bellows : AISI 321 Stainless-steel double layer of 0,5mm thickness liner : AISI 321 Stainless-steel...
Â


Manufacturing of DN1250 Exhaust Gas Compansator
Dn 1250 Pn 2,5 Tdeg 500c  Axial Movements +/- 60 mm
Â


Manufacturing of DN300 Axial Compensator for m/v New Cap
Carbon Steel Moveable Flanged Axial Compensator * 2 years Guarantee against wrong material and manufacturing faults
Â


New Anchor Chain And Kenter Shackle Supplied
14 lengths of Stud Link Anchor Chains size 44mm, Grade3, 27.5mtr/length
16 pcs Joining Kenter Shackle size 44mm, Grade3
Â


14cbm Grabs are supplied for Cargo Cranes of HR MARGARETHA
3 pcs 14cbm grabs are manufactured in Turkey (within 7 days) and grabs are supplied to m/v HR MARGARETHA during her D/D period at Desan Ship
Â
bottom of page
