Places where blocks are assembled. Before assembled, blocks are usually outfitted and painted to save dry dock-working time. After the final block is assembled, dock is filled with sea water for launching a ship.
|
 |
 |
 |
|
Dock |
Capacity |
Dimension |
Crane/Service |
|
|
|
|
400,000DWT |
|
|
12.5 |
200ton Jib Crane
3
80ton Jib Crane 1 |
No. 2 Dock |
400,000DWT |
380 |
65 |
12.5 |
200ton Jib Crane
2
|
No. 3 Dock |
400,000DWT |
380 |
65 |
12.5 |
200ton Jib Crane
3
80ton Jib Crane 1 |
No. 4 Dock |
350,000DWT |
300 |
76 |
12.5 |
200ton Jib Crane
2 |
|
|
|
|
|
|